On 5, 6 and 7 July in Milan we met people to tell how we improve the security and efficiency of our electricity grid.
|
|
Key
-
Cable in operation
-
Cable in progress
-
Cable in progress soon
-
Existing oil cable
-
Overhead line
-
Overhead cable route
Key
-
A.SE Ospiate -CP Fiera 2.3 km 132 kV T. 016 overhead line
-
B.CP Ospiate-CP Fiera-CS Fiorenza 3.1 km 132 kV T. 017 overhead line
-
C.CS AMSA Figino-CP Novate (partial) 2.7 km 132 kV T. 026 overhead line
-
D.CP Musocco-CS Fiorenza 2.2 km 132 kV T. 543 line
-
E.SE Baggio - CP Musocco (partial) 2.8 km 132 kV T. 544 line
-
F.SE Baggio -Porta Volta 2.4 km 220 kV T. 285 overhead line
|
The project
These are the main works for an ever better grid interconnection and security of the supply in the city of Milan, which alone exceeds 30% of regional electricity consumption.
- New 380 kV section of the electrical substation (ES) Magenta, with new connections to the 380kV Turbigo-Baggio line and partial burial of the 132 kV grid in the Municipality of Magenta (MI) (now in executive design stage - post-authorization)
- Connection projects in e-e underground cable to the 132 kV “Ospiate - RISE Sesto” T.919 line of the primary distribution station (CP) Vulcano CDS (Città della Salute) in the Municipality of Milan (undergoing authorization)
- New 380 kV “Cassano-Chiari” power line in the Municipality of Cassano d’Adda (MI) (undergoing authorization)
Works plan
|
(Year of completion) |
Baggio – Ric. Ovest (West) |
2013 |
Ric. Sud (South) – Ric. Ovest (West) |
2016 |
Gadio – Ric. Nord (North) |
2017 |
SE Marcello connections |
2017 |
Ric. Ovest (West) - Gadio |
2018 |
P. Volta – P. Venezia |
2019 |
Marcello – Porta Venezia |
2019 |
Gadio armoured rebuild |
2021 |
Ospiate – Torretta |
2023 |
MI armoured rebuild Ric. Sud (South) |
2024 |