5,977
professionals
ACROSS THE COUNTRY
2,005 in the north
2,754 in the centre
(including Sardinia)
1,218 in the south
(including Sicily)
figures as 31/12/2024
including Tamini, Avvenia, LT and Brugg
75,236 Km
of power lines managed
915 electrical substations
4 control centres
312*TWh
Demand of electricity (*provisional figure)
380 kV NTG Substation
380 kV NTG line
≥380 kVcc NTG line,
cable
figures as 31/12/2024 > Learn about the evolution of the Italian National Transmission Grid: the 2025 Development Plan sets out over 23 billion euros in investments to facilitate the integration of renewables and increase transport capacity.
MAIN OFFICES
Turin
Milan
Padua
Florence
Rome
Naples
Cagliari
Palermo
Offices Plant units
12 professionals
(seconded personnel included)
INTERCONNECTIONS
Italy - Montenegro HVDC
445 km long
600 MW power
OFFICE
Podgorica
3
BY COUNTRY
3 in Peru
PERU
Aguaytía - Pucallpa
Mato Grosso
Lima
CHILE
Santiago