6,850

Birds tracked

78

Species

12

Time span (months)

mappa bisaccia-deliceto punti di rilevazione dati avifauna

The new 380 kV line between the electrical substations of Deliceto, in the province of Foggia, and Bisaccia (Avellino) will make it possible to strengthen the energy connection between the Adriatic and Tyrrhenian backbones, for a secure transfer of the energy produced in Apulia to Campania. In particular, an ever-increasing integration of the new renewable production plants, above all wind, will be ensured, with a reduction of the current production limits.

Download data

BIRDS TRACKED

Below it is a representation of the species tracked

2,618

Birds tracked

47

Species

2

Time span (months)

mappa paternò-priolo punti di rilevazione dati avifauna

The new 380 kV power line for the expansion and rationalisation of the eastern Sicilian grid. This project will reinforce the safety and reliability of the service in the high-load areas of Catania and Syracuse. Specifically, an adjustment to production capacity of the Priolo Gargallo area is planned, with a reduction in energy costs.

Download data

BIRDS TRACKED

Below it is a representation of the species tracked