The new line is on the same path as the existing one which will be demolished for the benefit of lower land consumption.
Connection in the project
Demolitions
New 150kV terrestrial cable power line in single triad.
Works inside the existing Electric Stations
The new line is on the same path as the existing one which will be demolished for the benefit of lower land consumption
Click on the locations to find out more about our interventions.