Mappa Milano

Key

  • Cable in operation

  • Cable in progress

  • Cable in progress soon

  • Existing oil cable

  • Overhead line

  • Overhead cable route

Key

  • A.SE Ospiate -CP Fiera 2.3 km 132 kV T. 016 overhead line

  • B.CP Ospiate-CP Fiera-CS Fiorenza 3.1 km 132 kV T. 017 overhead line

  • C.CS AMSA Figino-CP Novate (partial) 2.7 km 132 kV T. 026 overhead line

  • D.CP Musocco-CS Fiorenza 2.2 km 132 kV T. 543 line

  • E.SE Baggio - CP Musocco (partial) 2.8 km 132 kV T. 544 line

  • F.SE Baggio -Porta Volta 2.4 km 220 kV T. 285 overhead line