Terna completed the laying of the east section of the Tyrrhenian Link which will connect Campania and Sicily
05/08/2025 - 11:19 AM
Terna, Tyrrhenian Link: submarine cable laying started in Sicily
02/07/2025 - 11:53 AM
Terna: project involving the experimental transplanting of Cymodocea nodosa in the Fiumetorto landing site (PA) has been launched
08/02/2024 - 12:47 PM
Terna: EIB provides the last tranche of the €1.9 billion financing for the Tyrrhenian Link
02/08/2024 - 10:23 AM
Terna and the Department of Cultural Heritage and Sicilian Identity: works begin to safeguard Cornelius aqueduct in Termini Imerese, province of Palermo
10/12/2023 - 11:51 AM
Tyrrhenian Link: the Ministry of the Environment and Energy Security has authorized the western branch, connecting Sicily and Sardinia
09/12/2023 - 10:28 AM
Terna: EIB provides the second and third tranches of the €1.9 billion loan for the Tyrrhenian Link
03/30/2023 - 3:40 PM
Terna: EIB provides €1.9 billion in financing for Tyrrhenian Link
11/08/2022 - 10:47 AM
Terna, Tyrrhenian Link: authorisation process started for the west section between Sicily and Sardinia
10/12/2022 - 10:31 AM
Terna, Tyrrhenian link: the east section, connecting Campania and Sicily, authorised by the Italian Ministry of Ecological Transition
10/04/2022 - 3:57 PM
Tyrrhenian Link: Terna submits a request for authorisation for the west section, between Sicily and Sardinia, to MiTE
05/09/2022 - 11:21 AM
Terna, Tyrrhenian Link: Selargius, in the province of Cagliari, confirmed as the site of the converter substation
04/13/2022 - 5:47 PM
Terna, Tyrrhenian Link: the converter substation will be in Caracoli, in the municipality of Termini Imerese (PA)
04/12/2022 - 5:55 PM
Terna presents the results of the public consultation on the west branch of the Tyrrhenian link
04/06/2022 - 11:39 AM
Terna, Tyrrhenian Link: framework contracts for the supply of submarine power links awarded to Prysmian and Nexans
11/30/2021 - 11:25 AM
Terna, Tyrrhenian Link: the authorisation process for the East section connecting Campania and Sicily begins
11/09/2021 - 10:31 AM
Terna: the second phase of public consultation for the Tyrrhenian Link begins
09/28/2021 - 11:40 AM
Terna: the second phase of public consultation for the Tyrrhenian Link begins
09/24/2021 - 12:40 PM
Terna: results of the public consultation on the Tyrrhenian Link presented to citizens
03/31/2021 - 5:40 PM
Terna: the Tyrrhenian Link substation is to be built next to the existing Caracoli plant, in the municipality of Termini Imerese (PA)
03/30/2021 - 7:40 PM
Terna presents the results of the public consultation on the Tyrrhenian Link to citizens
03/29/2021 - 2:00 PM
Terna presents the results of the public consultation on the Tyrrhenian Link to citizens
03/28/2021 - 3:00 PM
Terna launches the public consultation for the Tyrrhenian link
01/27/2021 - 12:44 PM
Terna launches the public consultation for the Tyrrhenian link
01/26/2021 - 2:00 PM
Vedi sul CMS
The Tyrrhenian link: the double underwater connection between Sicily, Sardinia and the Italian peninsula
An infrastructure of international significance for a more sustainable energy future, strengthening the Mediterranean energy hub
Stages of the works
History of the Tyrrhenian Link: all the news and stages, from Public Consultation to “Terna Incontra” events and the project authorization
The project
The project in short: all information on the two infrastructure sections and the technology employed. Find out what undersea and underground cable look like